您好,欢迎来到宝捱科技网。
搜索
您的当前位置:首页试用自我评价 篇18

试用自我评价 篇18

来源:宝捱科技网


  To after the goods tender, the Ministry of the staff of my extra care, care for every possible way, so I feel the warmth of the family here, which can enable me to quickly enter the work role. (Zhanjiang project boiler, steam turbine, generator) technical negotiations; Wuhan Boiler Plant, North Heavy Company (Zhanjiang project boiler, steam turbine, generator) technical negotiations; Zhanjiang project of the original (Zhanjiang project boiler, turbine, generator) technical negotiations; Fuel sample preparation system, sintering product testing device technology exchange (Xuzhou Hull).

  Involved in the tender review of the project: Baosteel Research Institute of Stainless Steel Technology Center tensile testing machine project tender review; Stainless Steel Division ICP emission spectrometer project tender review; Baosteel Detection Company X fluorescence spectrometer project tender review. Participated in the pre-bid project: Baoshan Iron and Steel International centralized purchasing (Shenyang, Fuzhou). Baoshan Iron & Steel Co., Ltd., Baoshan Iron & Steel Co., Ltd., Baoshan Iron & Steel Co., Ltd., Baoshan Iron & Steel Co., Ltd., Baoshan Iron & Steel Co., Ltd., Baoshan Iron & Steel Co., Ltd., The Ministry of 2030 cold-rolled 25 t overhead cranes.

  In the above work, according to the instructions of the master, I have carried out rigorous operation on every link in the tender. I have benefited greatly from not only the excellent professional quality and the ability of organizing and coordinating, but also from the dairy leadership.To the tender industry a good work ethic and practical work hard work style.

  As a young tenderer, may be due to lack of experience and bring more trouble, but I have problems for the tender to the master humbly ask for advice, and actively sum up the approach, and keen on the accumulation of problem-solving program. For example, under the guidance of the master independently completed the international standard tensile testing machine project, including pre-technical exchanges, tender review, the preparation of tender documents, announcements, tracking bid, opening and a series of work.

  During the encounter a lot of difficulties, only 2 to purchase the tender to the Shanghai Electrical and Mechanical Office to apply for two bids, drawn judges, the number of times in the international tender network does not get enough judges, 2 to electromechanical Office expert. On the eve of the opening of one of the interim decision not to participate in the bidding, resulting in the flow mark. At the same time because of my lack of experience in the international bidding network misuse in the tender deadline to modify the notice before, resulting in two bids can not be submitted to the record, in consultation with the international bidding network staff, in time with the Shanghai Electrical and Mechanical Office to communicate , To make up for the previous error.

  In short, in this 3 months internship period I deeply feel the company's human management, feel the company's vigorous and caring staff caring and warm feeling. At the same time I am eager to get the affirmation of the leadership of the company, on schedule to positive, I will use my practical actions for the development of International Tendering Co., Ltd. to make their own contribution.

Copyright © 2019- baoaiwan.com.cn 版权所有

违法及侵权请联系:TEL:199 18 7713 E-MAIL:2724546146@qq.com

本站由北京市万商天勤律师事务所王兴未律师提供法律服务